370 ft
Distance
| Address | Bed / Bath | Listing Price |
|---|---|---|
800 Maplegrove Avenue
Charming tudor in prime Royal Oak location! Don't miss this beautifully updated 4 bedroom, 2 full bath brick tudor-style gem located on a tree lined street with vintage homes and walkable to the heart of downtown Royal Oak. Step inside to discover an open layout featuring gleaming hardwood floors an
Living Area:
1495 Sqft.
|
4
Beds,
2
Baths
|
$449,900 |
800 Maplegrove Avenue
Charming tudor in prime Royal Oak location! Don't miss this beautifully updated 4 bedroom, 2 full bath brick tudor-style gem located on a tree lined street with vintage homes and walkable to the heart of downtown Royal Oak. Step inside to discover an open layout featuring gleaming hardwood floors a
Living Area:
1495 Sqft.
|
4
Beds,
2
Baths
|
$449,900 |
1353 Cambridge Road
This charming, move-in-ready brick ranch is a rare gem in the heart of Berkley, that's been tastefully updated for modern living. The main floor features 3 bedrooms and 1 full bathroom, allowing for SINGLE LEVEL LIVING! Refinished HDW floors begin at the front entrance and continue throughout the ma
Living Area:
2054 Sqft.
|
3
Beds,
2
Baths
|
$387,000 |
2221 Columbia Road
Totally Updated Berkley Bungalow! Welcome home to this beautifully updated bungalow offering approximately 1,300 square feet of above-grade living space plus an additional 800 square feet of finished living area in the basement! The charming, modern kitchen features quartz countertops, a subway tile
Living Area:
1987 Sqft.
|
3
Beds,
2
Baths
|
$380,000 |
1353 Cambridge Road
This charming, move-in-ready brick ranch is a rare gem in the heart of Berkley, that's been tastefully updated for modern living. The main floor features 3 bedrooms and 1 full bathroom, allowing for SINGLE LEVEL LIVING! Refinished HDW floors begin at the front entrance and continue throughout the ma
Living Area:
2054 Sqft.
|
3
Beds,
2
Baths
|
$387,000 |
2221 Columbia Road
Totally Updated Berkley Bungalow!
Welcome home to this beautifully updated bungalow offering approximately 1,300 square feet of above-grade living space plus an additional 800 square feet of finished living area in the basement!
The charming, modern kitchen features quartz countertops, a subway ti
Living Area:
1987 Sqft.
|
3
Beds,
2
Baths
|
$380,000 |
1353 Cambridge Road
This charming, move-in-ready brick ranch is a rare gem in the heart of Berkley, that's been tastefully updated for modern living. The main floor features 3 bedrooms and 1 full bathroom, allowing for SINGLE LEVEL LIVING! Refinished HDW floors begin at the front entrance and continue throughout the ma
Living Area:
2054 Sqft.
|
3
Beds,
2
Baths
|
$387,000 |
1322 Catalpa Drive
Welcome home to this beautifully updated open-concept Colonial in the heart of Berkley! Enjoy your morning coffee on the charming covered front porch overlooking the tree-lined street. Step inside to an inviting open layout perfect for entertaining and everyday living. The spacious backyard is a rar
Living Area:
2100 Sqft.
|
3
Beds,
2
Baths
|
$550,000 |
1868 Cass Boulevard
A beautifully updated Berkley charmer that blends modern convenience with timeless character! This inviting home offers 3 spacious bedrooms, a thoughtfully updated kitchen, and a fully renovated bathroom - perfect for those seeking move-in-ready living in one of Metro Detroit's most desirable comm
Living Area:
1500 Sqft.
|
3
Beds,
1
Bath
|
$375,000 |
1322 Catalpa Drive
Welcome home to this beautifully updated open-concept Colonial in the heart of Berkley! Enjoy your morning coffee on the charming covered front porch overlooking the tree-lined street. Step inside to an inviting open layout perfect for entertaining and everyday living. The spacious backyard is a rar
Living Area:
2100 Sqft.
|
3
Beds,
2
Baths
|
$550,000 |
1868 Cass Boulevard
A beautifully updated Berkley charmer that blends modern convenience with timeless character! This inviting home offers 3 spacious bedrooms, a thoughtfully updated kitchen, and a fully renovated bathroom — perfect for those seeking move-in-ready living in one of Metro Detroit’s most desirable co
Living Area:
1500 Sqft.
|
3
Beds,
1
Bath
|
$375,000 |
1714 W Farnum Avenue
In the highly sought after Maple Grove Sub, step into this beautifully maintained 3-bedroom, 2-bath home that perfectly blends timeless character with modern updates. Original architectural details and natural oak floors highlight the home’s 1930s charm, while recent renovations bring a fresh, sty
Living Area:
1204 Sqft.
|
3
Beds,
2
Baths
|
$375,000 |
1714 W Farnum Avenue
In the highly sought after Maple Grove Sub, step into this beautifully maintained 3-bedroom, 2-bath home that perfectly blends timeless character with modern updates. Original architectural details and natural oak floors highlight the home's 1930s charm, while recent renovations bring a fresh, styli
Living Area:
1204 Sqft.
|
3
Beds,
2
Baths
|
$375,000 |
800 CAMBRIDGE Road
READY TO MOVE IN!!! This completely remodeled Bungalow has an open concept with an eat in kitchen with stainless steel appliances and granite counter tops. Hardwood floors throughout the main floor and in 2 main floor bedrooms. Rare find in Berkley, an upstairs master bedroom with an en suite bathr
Living Area:
1700 Sqft.
|
3
Beds,
2
Baths
|
$355,000 |
800 CAMBRIDGE Road
READY TO MOVE IN!!! This completely remodeled Bungalow has an open concept with an eat in kitchen with stainless steel appliances and granite counter tops. Hardwood floors throughout the main floor and in 2 main floor bedrooms. Rare find in Berkley, an upstairs master bedroom with an en suite bathro
Living Area:
1700 Sqft.
|
3
Beds,
2
Baths
|
$355,000 |
14231 Borgman Street
Charming and well-maintained 3-bedroom, 1.5-bath ranch offering 1,296 sq ft of comfortable living space in a quiet, friendly neighborhood. The home features a great floor plan with a spacious eat-in kitchen that opens to a cozy family room—perfect for everyday living and entertaining. A bright for
Living Area:
1296 Sqft.
|
3
Beds,
2
Baths
|
$255,000 |
14231 Borgman Street
Charming and well-maintained 3-bedroom, 1.5-bath ranch offering 1,296 sq ft of comfortable living space in a quiet, friendly neighborhood. The home features a great floor plan with a spacious eat-in kitchen that opens to a cozy family room--perfect for everyday living and entertaining. A bright form
Living Area:
1296 Sqft.
|
3
Beds,
2
Baths
|
$255,000 |
1560 Columbia Road
Charming, Newly Renovated 4-bedroom 2-bathroom Bungalow in desirable Berkley. Welcoming, bright, and spacious living room and dining room, with hardwood floors on the main level. Remodeled kitchen with granite countertops (2020), stainless steel appliances, and a garden window. New main bathroom (20
Living Area:
2201 Sqft.
|
4
Beds,
2
Baths
|
$390,000 |
3116 Coolidge Highway
Prime Berkley Opportunity - Investment or Dream Renovation! Charming 2-bedroom ranch located on a premier lot facing Earlmont Road, one of Berkley's most desirable streets. This solid home offers a nice open floor plan, two spacious bedrooms, and a bright sun porch. The lot provides fantastic potent
Living Area:
709 Sqft.
|
2
Beds,
1
Bath
|
$189,000 |
1908 Cambridge Road
Welcome home! This is not your typical Berkley bungalow. Enjoy all the updates and features that this charmer has to offer. Walk up to the inviting front deck overlooking the well-manicured front yard and step into the bright, spacious living room with recessed lighting and hardwood floors throughou
Living Area:
1527 Sqft.
|
3
Beds,
2
Baths
|
$365,000 |
2165 Sunnyknoll Avenue
Don’t miss this wonderful opportunity to own a charming ranch home in one of Berkley’s most desirable neighborhoods! Perfect for first-time buyers or those looking to downsize, this well-maintained 3-bedroom, 1.5-bath (2nd bath just needs shower finished) home offers comfort, character, and conv
Living Area:
1856 Sqft.
|
3
Beds,
2
Baths
|
$275,000 |
14231 Borgman Street
Charming and well-maintained 3-bedroom, 1.5-bath ranch offering 1,296 sq ft of comfortable living space in a quiet, friendly neighborhood. The home features a great floor plan with a spacious eat-in kitchen that opens to a cozy family room--perfect for everyday living and entertaining. A bright form
Living Area:
1296 Sqft.
|
3
Beds,
2
Baths
|
$255,000 |
3116 Coolidge Highway
Prime Berkley Opportunity - Investment or Dream Renovation! Charming 2-bedroom ranch located on a premier lot facing Earlmont Road, one of Berkley's most desirable streets. This solid home offers a nice open floor plan, two spacious bedrooms, and a bright sun porch. The lot provides fantastic poten
Living Area:
709 Sqft.
|
2
Beds,
1
Bath
|
$189,000 |
1908 Cambridge Road
Welcome home! This is not your typical Berkley bungalow. Enjoy all the updates and features that this charmer has to offer. Walk up to the inviting front deck overlooking the well-manicured front yard and step into the bright, spacious living room with recessed lighting and hardwood floors throughou
Living Area:
1527 Sqft.
|
3
Beds,
2
Baths
|
$365,000 |
2165 Sunnyknoll Avenue
Don't miss this wonderful opportunity to own a charming ranch home in one of Berkley's most desirable neighborhoods! Perfect for first-time buyers or those looking to downsize, this well-maintained 3-bedroom, 1.5-bath (2nd bath just needs shower finished) home offers comfort, character, and convenie
Living Area:
1856 Sqft.
|
3
Beds,
2
Baths
|
$275,000 |
1560 Columbia Road
Charming, Newly Renovated 4-bedroom 2-bathroom Bungalow in desirable Berkley. Welcoming, bright, and spacious living room and dining room, with hardwood floors on the main level. Remodeled kitchen with granite countertops (2020), stainless steel appliances, and a garden window. New main bathroom (20
Living Area:
2201 Sqft.
|
4
Beds,
2
Baths
|
$390,000 |
24701 Scotia Road
Beautifully updated 3-bedroom, 2-bath ranch on a spacious lot over a quarter acre! Excellent location with easy highway access. Features a modern kitchen with new cabinets, countertops, and stainless steel appliances, updated bathrooms with stylish finishes, and luxury flooring throughout. Enjoy ple
Living Area:
2697 Sqft.
|
3
Beds,
2
Baths
|
$279,900 |
24701 Scotia Road
Beautifully updated 3-bedroom, 2-bath ranch on a spacious lot over a quarter acre! Excellent location with easy highway access. Features a modern kitchen with new cabinets, countertops, and stainless steel appliances, updated bathrooms with stylish finishes, and luxury flooring throughout. Enjoy ple
Living Area:
2697 Sqft.
|
3
Beds,
2
Baths
|
$279,900 |
1409 Sunset Boulevard
Timeless Elegance: Historic 1920s Vinsetta Park Colonial--Walking up to this stunning historic Royal Oak home, you can instantly feel the grandness that awaits. Built in 1924, the exquisite craftsmanship is immediately visible, starting with the original stained glass on the foyer door and the magni
Living Area:
2513 Sqft.
|
5
Beds,
2
Baths
|
$625,000 |
1409 Sunset Boulevard
Timeless Elegance: Historic 1920s Vinsetta Park Colonial--Walking up to this stunning historic Royal Oak home, you can instantly feel the grandness that awaits. Built in 1924, the exquisite craftsmanship is immediately visible, starting with the original stained glass on the foyer door and the magni
Living Area:
2513 Sqft.
|
5
Beds,
2
Baths
|
$625,000 |
686 Princeton Road
Welcome to Berkley... a great house in a great location just waiting for its new owners to make this a home. All the hard work has been done... new windows and gutters in 2014, a new furnace in 2013, spray foam insulation down in 2022, water tank in 2015, new sewer line done in 2017 and finally th
Living Area:
1358 Sqft.
|
3
Beds,
2
Baths
|
$399,900 |
686 Princeton Road
Welcome to Berkley... a great house in a great location just waiting for its new owners to make this a home. All the hard work has been done... new windows and gutters in 2014, a new furnace in 2013, spray foam insulation down in 2022, water tank in 2015, new sewer line done in 2017 and finally the
Living Area:
1358 Sqft.
|
3
Beds,
2
Baths
|
$399,900 |
13646 Hart Street
Beautifully renovated N. OAK PARK Bungalow, BERKLEY SCHOOL DISTRICT! An amazing opportunity to own this home ,expertly renovated for smart function and modern aesthetic.Marrying both contemporary design with retro charm,THIS HOUSE IS EXQUISITELY CARED FOR! Be welcomed by open concept living with har
Living Area:
2040 Sqft.
|
3
Beds,
1
Bath
|
$299,000 |
13646 Hart Street
Beautifully renovated N. OAK PARK Bungalow, BERKLEY SCHOOL DISTRICT! An amazing opportunity to own this home ,expertly renovated for smart function and modern aesthetic.Marrying both contemporary design with retro charm,THIS HOUSE IS EXQUISITELY CARED FOR! Be welcomed by open concept living with har
Living Area:
2040 Sqft.
|
3
Beds,
1
Bath
|
$299,000 |
3325 Catalpa Drive
A classic brick bungalow blending character with thoughtful updates, offering 3 bed/2 full bath. Fresh paint and new flooring provide a polished canvas, while sunlight pours into every corner. The kitchen flows seamlessly into a bright dining nook framed by bay windows. Upstairs, the spacious primar
Living Area:
1458 Sqft.
|
3
Beds,
2
Baths
|
$299,000 |
3325 Catalpa Drive
A classic brick bungalow blending character with thoughtful updates, offering 3 bed/2 full bath. Fresh paint and new flooring provide a polished canvas, while sunlight pours into every corner. The kitchen flows seamlessly into a bright dining nook framed by bay windows. Upstairs, the spacious primar
Living Area:
1458 Sqft.
|
3
Beds,
2
Baths
|
$299,000 |
1027 W 11 Mile W Eleven Mile
Welcome to 1027 West 11 Mile Rd, a stunning Prairie Style Craftsman home located in the Hendrie Blvd sub. This home has been exquisitely renovated with emphasis upon period detail. Upon your approach notice the newer exposed aggregate drive and walkway. The charming entry opens to the living and din
Living Area:
1862 Sqft.
|
3
Beds,
2
Baths
|
$625,000 |
1027 W 11 Mile W Eleven Mile
Welcome to 1027 West 11 Mile Rd, a stunning Prairie Style Craftsman home located in the Hendrie Blvd sub. This home has been exquisitely renovated with emphasis upon period detail. Upon your approach notice the newer exposed aggregate drive and walkway. The charming entry opens to the living and din
Living Area:
1862 Sqft.
|
3
Beds,
2
Baths
|
$625,000 |
10774 Lincoln Drive
This is it! Great ranch in highly sought-after neighborhood in Huntington Woods with walking distance to the rec center and library! This home offers a bright and spacious living + dining area with hardwood floors, coved ceilings and abundant natural light. An efficiently designed kitchen features a
Living Area:
1578 Sqft.
|
3
Beds,
2
Baths
|
$425,000 |
10774 Lincoln Drive
This is it! Great ranch in highly sought-after neighborhood in Huntington Woods with walking distance to the rec center and library! This home offers a bright and spacious living + dining area with hardwood floors, coved ceilings and abundant natural light. An efficiently designed kitchen features a
Living Area:
1578 Sqft.
|
3
Beds,
2
Baths
|
$425,000 |
2540 Royal Avenue
Welcome home to this beautifully maintained colonial in desirable Berkley! Enjoy gorgeous hardwood floors throughout the open-concept living and dining area, with built-ins surrounding a stunning stacked stone gas fireplace. The updated kitchen features granite counters, soft-close cabinets, a built
Living Area:
2553 Sqft.
|
4
Beds,
3
Baths
|
$530,000 |
2540 Royal Avenue
Welcome home to this beautifully maintained colonial in desirable Berkley! Enjoy gorgeous hardwood floors throughout the open-concept living and dining area, with built-ins surrounding a stunning stacked stone gas fireplace. The updated kitchen features granite counters, soft-close cabinets, a built
Living Area:
2553 Sqft.
|
4
Beds,
3
Baths
|
$530,000 |
10154 ELGIN Avenue
Built in 1937 by H &H Weimeister! This art deco home was owned by the LONE RANGER-Clayton Moore, the garage was made into a stall for his horse- SILVER. The 125 x60 corner lot was fenced. Home has 2 bedrooms, 1 bath wIth a large THREE SEASON ROOM. Your opportunity to add on or update!
Living Area:
1153 Sqft.
|
2
Beds,
1
Bath
|
$449,000 |
10154 ELGIN Avenue
Built in 1937 by H &H Weimeister! This art deco home was owned by the LONE RANGER-Clayton Moore, the garage was made into a stall for his horse- SILVER. The 125 x60 corner lot was fenced. Home has 2 bedrooms, 1 bath wIth a large THREE SEASON ROOM. Your opportunity to add on or update!
Living Area:
1153 Sqft.
|
2
Beds,
1
Bath
|
$449,000 |
1320 Hartrick Avenue
Spacious (2,147 Sq Ft) and updated Royal Oak colonial. Primary bedroom suite, plus 3 bedrooms, plus an office, plus an eat in kitchen, plus a formal dining room, plus a first floor laundry, plus a finished lower level. The primary bedroom suite has a walk in closet, 2nd closet, bath with tile stall
Living Area:
3047 Sqft.
|
4
Beds,
4
Baths
|
$550,000 |
13651 Elgin Street
Well-maintained 3-bedroom, 2-bath bungalow, with Berkley Schools! Features include an updated kitchen with granite counters and wood cabinetry, hardwood floors, and a spacious upstairs primary suite with full bath. The basement offers additional living space with a partial finish, sump pump, and a n
Living Area:
1956 Sqft.
|
3
Beds,
2
Baths
|
$274,900 |
13651 Elgin Street
Well-maintained 3-bedroom, 2-bath bungalow, with Berkley Schools! Features include an updated kitchen with granite counters and wood cabinetry, hardwood floors, and a spacious upstairs primary suite with full bath. The basement offers additional living space with a partial finish, sump pump, and a n
Living Area:
1956 Sqft.
|
3
Beds,
2
Baths
|
$274,900 |
1320 Hartrick Avenue
Spacious (2,147 Sq Ft) and updated Royal Oak colonial. Primary bedroom suite, plus 3 bedrooms, plus an office, plus an eat in kitchen, plus a formal dining room, plus a first floor laundry, plus a finished lower level. The primary bedroom suite has a walk in closet, 2nd closet, bath with tile st
Living Area:
3047 Sqft.
|
4
Beds,
4
Baths
|
$550,000 |
2376 Thomas Avenue
To describe this home in one word - IMMACULATE. With the massive addition, you won't find a bigger ranch in the area! Recent appraisal as of 10/3/25 reported a value of $550,000! Homes like this don't come around often! This Berkley home has been completely remodeled and expanded with incredible att
Living Area:
2341 Sqft.
|
3
Beds,
3
Baths
|
$479,000 |
2376 Thomas Avenue
To describe this home in one word - IMMACULATE. With the massive addition, you won't find a bigger ranch in the area! Recent appraisal as of 10/3/25 reported a value of $550,000! Homes like this don't come around often! This Berkley home has been completely remodeled and expanded with incredible at
Living Area:
2341 Sqft.
|
3
Beds,
3
Baths
|
$479,000 |
2376 Thomas Avenue
To describe this home in one word - IMMACULATE. With the massive addition, you won't find a bigger ranch in the area! Recent appraisal as of 10/3/25 reported a value of $550,000! Homes like this don't come around often! This Berkley home has been completely remodeled and expanded with incredible at
Living Area:
2341 Sqft.
|
3
Beds,
3
Baths
|
$479,000 |
10419 W 11 Mile Road
This charming home is located in a vibrant neighborhood, Certified Appraisal completed in September 2025 at 435,00. Home featuring a newly renovated kitchen that boasts quartz countertops, quartz wall accents and porcelain tile flooring. The two full bathrooms are also beautifully finished with porc
Living Area:
2886 Sqft.
|
4
Beds,
2
Baths
|
$395,000 |
1673 West Boulevard
Turn the key and move right in! This rare 3-bedroom, 2-bath bungalow is ideally located just blocks from Woodward, Vinsetta Garage, Rogers Elementary, and Berkley High School. You won't find many homes like this in the Woodward Corridor. Featuring a full upstairs bathroom and an extra-deep 2.5-car g
Living Area:
1835 Sqft.
|
3
Beds,
2
Baths
|
$315,000 |
10419 W 11 Mile Road
This charming home is located in a vibrant neighborhood, Certified Appraisal completed in September 2025 at 435,00. Home featuring a newly renovated kitchen that boasts quartz countertops, quartz wall accents and porcelain tile flooring. The two full bathrooms are also beautifully finished with porc
Living Area:
2886 Sqft.
|
4
Beds,
2
Baths
|
$395,000 |
1673 West Boulevard
Turn the key and move right in! This rare 3-bedroom, 2-bath bungalow is ideally located just blocks from Woodward, Vinsetta Garage, Rogers Elementary, and Berkley High School. You won't find many homes like this in the Woodward Corridor. Featuring a full upstairs bathroom and an extra-deep 2.5-car g
Living Area:
1835 Sqft.
|
3
Beds,
2
Baths
|
$315,000 |
13340 Dartmouth Street
OPEN HOUSE 11/8 12:30pm -2:30pm
Welcome to this charming Oak Park brick ranch! This move in ready home offers comfort, convenience, and modern updates throughout. Step inside to a bright, inviting living space that flows seamlessly into the kitchen, complete with a cozy breakfast nook, perfect for m
Living Area:
2089 Sqft.
|
3
Beds,
2
Baths
|
$289,000 |
13340 Dartmouth Street
OPEN HOUSE 11/8 12:30pm -2:30pm Welcome to this charming Oak Park brick ranch! This move in ready home offers comfort, convenience, and modern updates throughout. Step inside to a bright, inviting living space that flows seamlessly into the kitchen, complete with a cozy breakfast nook, perfect for m
Living Area:
2089 Sqft.
|
3
Beds,
2
Baths
|
$289,000 |
26725 Humber Street
Fantastic "Cottage Tudor" style bungalow with 4 bedrooms, 2.1 baths, a large open kitchen to the dining room, an open finished basement, wood floors, crown moldings, and a great fenced in yard--all in a great front of the Woods location. The formal front hall leads you to both the large living room
Living Area:
2552 Sqft.
|
4
Beds,
3
Baths
|
$459,999 |
26725 Humber Street
Fantastic "Cottage Tudor" style bungalow with 4 bedrooms, 2.1 baths, a large open kitchen to the dining room, an open finished basement, wood floors, crown moldings, and a great fenced in yard--all in a great front of the Woods location. The formal front hall leads you to both the large living room
Living Area:
2552 Sqft.
|
4
Beds,
3
Baths
|
$459,999 |
934 Lockwood Road
Matterport virtual walkthrough available on Homes. Royal Oak charmer with irresistible curb appeal featuring timeless architectural details, lush landscaping, and a spacious covered front porch that sets the tone for the warmth inside. Step through the entry vestibule into a sunlit living room cente
Living Area:
1883 Sqft.
|
3
Beds,
2
Baths
|
$425,000 |
934 Lockwood Road
Matterport virtual walkthrough available on Homes. Royal Oak charmer with irresistible curb appeal featuring timeless architectural details, lush landscaping, and a spacious covered front porch that sets the tone for the warmth inside. Step through the entry vestibule into a sunlit living room cente
Living Area:
1883 Sqft.
|
3
Beds,
2
Baths
|
$425,000 |
25200 Gardner Street
Welcome to this completely remodeled 3-bedroom, 3.5 bathroom corner lot ranch home featuring a finished basement and an attached garage. Nested in a prime Oak Park neighborhood, the exquisite home offers the perfect blend of modern luxury. The kitchen, which is an open concept to the entire home, ha
Living Area:
3961 Sqft.
|
3
Beds,
4
Baths
|
$499,000 |
25200 Gardner Street
Welcome to this completely remodeled 3-bedroom, 3.5 bathroom corner lot ranch home featuring a finished basement and an attached garage. Nested in a prime Oak Park neighborhood, the exquisite home offers the perfect blend of modern luxury. The kitchen, which is an open concept to the entire home, ha
Living Area:
3961 Sqft.
|
3
Beds,
4
Baths
|
$499,000 |
10024 BORGMAN Avenue
Welcome Home to your beautiful 2,445 sq ft new construction home, built by Yousif Building Solutions. It offers top-tier craftsmanship and high-end finishes. The striking exterior features stone accents for lasting curb appeal and a covered porch. At the same time, the interior showcases engineered
Living Area:
3376 Sqft.
|
4
Beds,
3
Baths
|
$1,100,000 |
10024 BORGMAN Avenue
Welcome Home to your beautiful 2,445 sq ft new construction home, built by Yousif Building Solutions. It offers top-tier craftsmanship and high-end finishes. The striking exterior features stone accents for lasting curb appeal and a covered porch. At the same time, the interior showcases engineered
Living Area:
3376 Sqft.
|
4
Beds,
3
Baths
|
$1,100,000 |
820 OAKRIDGE Avenue
JUST completed! This is a rare opportunity to own a new construction, Craftsman-style home on a generously sized lot in the heart of Royal Oak. Walking distance to downtown and close to dining, shopping, entertainment, and all major highways. This home boasts an impressive 3,638 sq. ft. of finished
Living Area:
3638 Sqft.
|
3
Beds,
4
Baths
|
$1,284,000 |
2715 Kenmore Road
Welcome to this bright and cheerful 3 bedroom ranch in the heart of Berkley! Situated on an extra wide lot, this super clean and freshly painted home is filled with natural light throughout. Enjoy peace of mind with major updates already done: brand new A/C (2025), roof (2023), high-efficiency furna
Living Area:
1370 Sqft.
|
3
Beds,
1
Bath
|
$277,500 |
2715 Kenmore Road
Welcome to this bright and cheerful 3 bedroom ranch in the heart of Berkley! Situated on an extra wide lot, this super clean and freshly painted home is filled with natural light throughout. Enjoy peace of mind with major updates already done: brand new A/C (2025), roof (2023), high-efficiency furna
Living Area:
1370 Sqft.
|
3
Beds,
1
Bath
|
$277,500 |
820 OAKRIDGE Avenue
JUST completed! This is a rare opportunity to own a new construction, Craftsman-style home on a generously sized lot in the heart of Royal Oak.
Walking distance to downtown and close to dining, shopping, entertainment, and all major highways.
This home boasts an impressive 3,638 sq. ft. of finished
Living Area:
3638 Sqft.
|
3
Beds,
4
Baths
|
$1,284,000 |
26015 ALLOR Avenue
Move-in ready all brick Colonial in Huntington Woods with 3 bedrooms, 1.1 baths, a great family room addition and a great finished basement! The kitchen and baths have been remodeled, all of the rooms are spacious, with beautiful wood floors and large windows, and flow seamlessly into each other. T
Living Area:
2508 Sqft.
|
3
Beds,
2
Baths
|
$455,000 |
2679 Columbia Road
Welcome to this beautifully renovated 3-bedroom, 2-bath bungalow boasting an open floor plan and thoughtful updates throughout. The heart of the home is the stunning kitchen, complete with a massive island topped with sleek white quartz countertops, providing both style and an abundance of storage.
Living Area:
1400 Sqft.
|
3
Beds,
2
Baths
|
$322,900 |
14670 Talbot Street
Solid North Oak Park home that boasts 4 bedrooms and 2.5 baths. Located in the heart of the sub, with sidewalks and close to everything! Enjoy 1685 square feet of living space. Lots of windows add to the bright and airy rooms. Many rooms are freshly painted. Great floorplan with kitchen and island a
Living Area:
1685 Sqft.
|
4
Beds,
3
Baths
|
$325,000 |
14670 Talbot Street
Solid North Oak Park home that boasts 4 bedrooms and 2.5 baths. Located in the heart of the sub, with sidewalks and close to everything! Enjoy 1685 square feet of living space. Lots of windows add to the bright and airy rooms. Many rooms are freshly painted. Great floorplan with kitchen and island
Living Area:
1685 Sqft.
|
4
Beds,
3
Baths
|
$325,000 |
400 Josephine Avenue
Do not let your opportunity to own this charming and stylish home located in a prime area of Royal Oak pass you by! With 630 sq. ft. of well-designed space, this home offers surprising comfort and functionality. The two bedrooms and living room feature new vinyl plank flooring, adding a modern touch
Living Area:
630 Sqft.
|
2
Beds,
1
Bath
|
$195,000 |
26015 ALLOR Avenue
Move-in ready all brick Colonial in Huntington Woods with 3 bedrooms, 1.1 baths, a great family room addition and a great finished basement! The kitchen and baths have been remodeled, all of the rooms are spacious, with beautiful wood floors and large windows, and flow seamlessly into each other. Th
Living Area:
2508 Sqft.
|
3
Beds,
2
Baths
|
$455,000 |
2679 Columbia Road
Welcome to this beautifully renovated 3-bedroom, 2-bath bungalow boasting an open floor plan and thoughtful updates throughout. The heart of the home is the stunning kitchen, complete with a massive island topped with sleek white quartz countertops, providing both style and an abundance of storage.
Living Area:
1400 Sqft.
|
3
Beds,
2
Baths
|
$322,900 |
400 Josephine Avenue
Do not let your opportunity to own this charming and stylish home located in a prime area of Royal Oak pass you by! With 630 sq. ft. of well-designed space, this home offers surprising comfort and functionality. The two bedrooms and living room feature new vinyl plank flooring, adding a modern touc
Living Area:
630 Sqft.
|
2
Beds,
1
Bath
|
$195,000 |
3339 Gardner Avenue
Welcome to this beautifully renovated gem just steps from Downtown Berkley! Every inch has been updated for modern living, starting with two stunning new bathrooms and a fully redesigned kitchen featuring quartz countertops, stylish backsplash, and all-new finishes. Enjoy peace of mind with a brand-
Living Area:
1272 Sqft.
|
2
Beds,
2
Baths
|
$309,900 |
3339 Gardner Avenue
Welcome to this beautifully renovated gem just steps from Downtown Berkley! Every inch has been updated for modern living, starting with two stunning new bathrooms and a fully redesigned kitchen featuring quartz countertops, stylish backsplash, and all-new finishes. Enjoy peace of mind with a brand-
Living Area:
1272 Sqft.
|
2
Beds,
2
Baths
|
$309,900 |
12750 Dartmouth Street
Well laid out, spacious brick ranch with 3 bedrooms, 3 bathrooms, (2 full 1 1/2 bath) wood floors throughout most of the main level. Three seasons room with deck, full size basement and much more.
Living Area:
1951 Sqft.
|
3
Beds,
3
Baths
|
$299,900 |
12750 Dartmouth Street
Well laid out, spacious brick ranch with 3 bedrooms, 3 bathrooms, (2 full 1 1/2 bath) wood floors throughout most of the main level. Three seasons room with deck, full size basement and much more.
Living Area:
1951 Sqft.
|
3
Beds,
3
Baths
|
$299,900 |
1149 LARKMOOR Boulevard
Nestled on the premier boulevard in Berkley, this fully renovated brick home blends a modern yet comfortable aesthetic to appease the most discerning buyer. As you enter from the newly constructed front porch, you will be greeted with a new open concept kitchen featuring semi handmade cabinetry, hon
Living Area:
2088 Sqft.
|
3
Beds,
2
Baths
|
$479,900 |
1149 LARKMOOR Boulevard
Nestled on the premier boulevard in Berkley, this fully renovated brick home blends a modern yet comfortable aesthetic to appease the most discerning buyer. As you enter from the newly constructed front porch, you will be greeted with a new open concept kitchen featuring semi handmade cabinetry, ho
Living Area:
2088 Sqft.
|
3
Beds,
2
Baths
|
$479,900 |
1957 Columbia Road
Welcome to 1957 Columbia Street, a beautifully updated and spacious home nestled in the heart of Berkley! This 3-bedroom, 2.5-bath residence offers 2,230 square feet of living space on an exceptionally rare double lot, with the added benefit of two driveways and a large 2-car deep garage. Inside, yo
Living Area:
2730 Sqft.
|
4
Beds,
3
Baths
|
$699,000 |
1957 Columbia Road
Welcome to 1957 Columbia Street, a beautifully updated and spacious home nestled in the heart of Berkley! This 3-bedroom, 2.5-bath residence offers 2,230 square feet of living space on an exceptionally rare double lot, with the added benefit of two driveways and a large 2-car deep garage. Inside, yo
Living Area:
2730 Sqft.
|
4
Beds,
3
Baths
|
$699,000 |
2519 Phillips Avenue
This stunning colonial has been completely renovated Featuring 4 bedrooms and 3 full baths with* ALMOST 2,500 SQ OF TOTAL LIVING SPACE*, and over $170,000 in upgrades! Located in a highly sought-after area, this home offers a modern open-concept living and dining room with new light fixtures and en
Living Area:
2490 Sqft.
|
4
Beds,
3
Baths
|
$509,900 |
2519 Phillips Avenue
This stunning colonial has been completely renovated Featuring 4 bedrooms and 3 full baths with* ALMOST 2,500 SQ OF TOTAL LIVING SPACE*, and over $170,000 in upgrades! Located in a highly sought-after area, this home offers a modern open-concept living and dining room with new light fixtures and en
Living Area:
2490 Sqft.
|
4
Beds,
3
Baths
|
$509,900 |
1591 Catalpa Drive
***Motivated seller offering a $1,500 credit toward landscaping improvements.***
Welcome to 1591 Catalpa, a fully renovated bungalow in the heart of Berkley! This 4-bedroom, 2-bath home has been thoughtfully updated from top to bottom, offering modern finishes and a bright open floor plan. The main
Living Area:
2070 Sqft.
|
4
Beds,
2
Baths
|
$399,000 |
1591 Catalpa Drive
***Motivated seller offering a $1,500 credit toward landscaping improvements.*** Welcome to 1591 Catalpa, a fully renovated bungalow in the heart of Berkley! This 4-bedroom, 2-bath home has been thoughtfully updated from top to bottom, offering modern finishes and a bright open floor plan. The main
Living Area:
2070 Sqft.
|
4
Beds,
2
Baths
|
$399,000 |
10425 Elgin Avenue
This beautifully reimagined bungalow in the heart of Huntington Woods has been practically rebuilt from the ground up, blending timeless charm with all the modern updates today's buyers are looking for. Nearly every aspect of the home has been thoughtfully renovated, creating a move-in-ready space t
Living Area:
1900 Sqft.
|
3
Beds,
2
Baths
|
$449,000 |
1630 W 12 Mile Road
Tucked into a charming corner of Royal Oak -- where the best parts of life come together -- you'll find your next home. Enjoy the perfect blend of neighborhood charm and urban convenience with easy access to nearby dining, shopping, and entertainment. Mature trees and classic Royal Oak homes line th
Living Area:
2716 Sqft.
|
3
Beds,
2
Baths
|
$435,000 |
1630 W 12 Mile Road
Tucked into a charming corner of Royal Oak -- where the best parts of life come together -- you’ll find your next home. Enjoy the perfect blend of neighborhood charm and urban convenience with easy access to nearby dining, shopping, and entertainment. Mature trees and classic Royal Oak homes line
Living Area:
2716 Sqft.
|
3
Beds,
2
Baths
|
$435,000 |
10425 Elgin Avenue
This beautifully reimagined bungalow in the heart of Huntington Woods has been practically rebuilt from the ground up, blending timeless charm with all the modern updates today’s buyers are looking for. Nearly every aspect of the home has been thoughtfully renovated, creating a move-in-ready space
Living Area:
1900 Sqft.
|
3
Beds,
2
Baths
|
$449,000 |
14421 Labelle Street
IMMEDIATE OCCUPANCY ! Welcome to this beautifully updated 3-bedroom BRICK ranch with attach 2 car garage , 1.5 bathroom in the heart of Oak Park! A completely remodeled home from top to bottom. kitchen is fully updated cabinetry, NEW stainless steel appliances and beautiful granite countertops, A la
Living Area:
1313 Sqft.
|
3
Beds,
2
Baths
|
$305,000 |
1674 Eaton Road
Experience the perfect blend of rustic charm and modern updates in this distinctive Berkley home. Ideally situated within the subdivision, it offers easy access to the Woodward Corridor and Downtown Berkley.
Inside, a bright living and dining area features a beautifully tiled fireplace with a wooden
Living Area:
1500 Sqft.
|
3
Beds,
2
Baths
|
$419,900 |
14421 Labelle Street
IMMEDIATE OCCUPANCY ! Welcome to this beautifully updated 3-bedroom BRICK ranch with attach 2 car garage , 1.5 bathroom in the heart of Oak Park! A completely remodeled home from top to bottom. kitchen is fully updated cabinetry, NEW stainless steel appliances and beautiful granite countertops
Living Area:
1313 Sqft.
|
3
Beds,
2
Baths
|
$305,000 |
1674 Eaton Road
Experience the perfect blend of rustic charm and modern updates in this distinctive Berkley home. Ideally situated within the subdivision, it offers easy access to the Woodward Corridor and Downtown Berkley. Inside, a bright living and dining area features a beautifully tiled fireplace with a wooden
Living Area:
1500 Sqft.
|
3
Beds,
2
Baths
|
$419,900 |
24621 Seneca Street
Nice home in Oak Park. Spacious home with nice size rooms throughout the home. Located close to a golf course and surrounding shopping. Two-Story colonial home. Full backyard for gatherings. Fenced backyard. Oversize garage for 2 cars and storage items. Ceiling fans in rooms. Partially finishe
Living Area:
4062 Sqft.
|
4
Beds,
3
Baths
|
$325,000 |
24621 Seneca Street
Nice home in Oak Park. Spacious home with nice size rooms throughout the home. Located close to a golf course and surrounding shopping. Two-Story colonial home. Full backyard for gatherings. Fenced backyard. Oversize garage for 2 cars and storage items. Ceiling fans in rooms. Partially finished base
Living Area:
4062 Sqft.
|
4
Beds,
3
Baths
|
$325,000 |
1416 Oxford Road
*** Owner says "Bring All Offers" *** Welcome Home to this Berkley Ranch. This well-maintained property offers 3 bedrooms and 1 full bathroom, situated on a quiet street. Interior features include hardwood flooring throughout, with significant recent updates for added value and peace of mind. Update
Living Area:
1055 Sqft.
|
3
Beds,
1
Bath
|
$344,900 |
1416 Oxford Road
*** Owner says "Bring All Offers" *** Welcome Home to this Berkley Ranch. This well-maintained property offers 3 bedrooms and 1 full bathroom, situated on a quiet street. Interior features include hardwood flooring throughout, with significant recent updates for added value and peace of mind. Update
Living Area:
1055 Sqft.
|
3
Beds,
1
Bath
|
$344,900 |
1761 Stanford Road
Back on Market! Welcome home to this beautifully renovated 3-bedroom, 1-bath gem in sought-after Berkley! This home has been completely transformed from top to bottom, offering modern finishes and a bright, inviting layout. Step inside to find brand-new flooring, fresh paint, and a stunning kitchen
Living Area:
1206 Sqft.
|
3
Beds,
1
Bath
|
$309,900 |
1761 Stanford Road
Back on Market! Welcome home to this beautifully renovated 3-bedroom, 1-bath gem in sought-after Berkley! This home has been completely transformed from top to bottom, offering modern finishes and a bright, inviting layout. Step inside to find brand-new flooring, fresh paint, and a stunning kitchen
Living Area:
1206 Sqft.
|
3
Beds,
1
Bath
|
$309,900 |
25109 Scotia Road
Updated in 2025, this beautifully preserved mid-century modern ranch offers nearly 2,000 square feet of bright, open living space with three spacious bedrooms and two and a half baths. The formal living and dining areas flow seamlessly, while the cozy family room boasts a natural brick fireplace and
Living Area:
1975 Sqft.
|
3
Beds,
3
Baths
|
$485,000 |
25109 Scotia Road
Updated in 2025, this beautifully preserved mid-century modern ranch offers nearly 2,000 square feet of bright, open living space with three spacious bedrooms and two and a half baths. The formal living and dining areas flow seamlessly, while the cozy family room boasts a natural brick fireplace and
Living Area:
1975 Sqft.
|
3
Beds,
3
Baths
|
$485,000 |
2085 Gardner Avenue
Rare Opportunity on a Large Lot in Berkley! Welcome to 2085 Gardner - a unique chance to own an oversized lot in a great neighborhood. This classic mid-century ranch is full of potential for renovation, expansion, or new construction. Whether you're looking to renovate and flip into a charming liv
Living Area:
862 Sqft.
|
2
Beds,
2
Baths
|
$220,000 |
2085 Gardner Avenue
Rare Opportunity on a Large Lot in Berkley!
Welcome to 2085 Gardner — a unique chance to own an oversized lot in a great neighborhood. This classic mid-century ranch is full of potential for renovation, expansion, or new construction.
Whether you're looking to renovate and flip into a charming l
Living Area:
862 Sqft.
|
2
Beds,
2
Baths
|
$220,000 |
1799 Phillips Avenue
Welcome to 1799 Phillips, a beautifully appointed mid-century bungalow located in the heart of Berkley--a city that perfectly blends timeless charm with modern convenience. This 3-bedroom, 2-bathroom single-family home sits on a spacious lot and features a detached 2-car garage, classic architectura
Living Area:
1139 Sqft.
|
3
Beds,
2
Baths
|
$269,000 |
1799 Phillips Avenue
Welcome to 1799 Phillips, a beautifully appointed mid-century bungalow located in the heart of Berkley--a city that perfectly blends timeless charm with modern convenience. This 3-bedroom, 2-bathroom single-family home sits on a spacious lot and features a detached 2-car garage, classic architectura
Living Area:
1139 Sqft.
|
3
Beds,
2
Baths
|
$269,000 |
1799 Phillips Avenue
Welcome to 1799 Phillips, a beautifully appointed mid-century bungalow located in the heart of Berkley—a city that perfectly blends timeless charm with modern convenience. This 3-bedroom, 2-bathroom single-family home sits on a spacious lot and features a detached 2-car garage, classic architectur
Living Area:
1139 Sqft.
|
3
Beds,
2
Baths
|
$269,000 |
1363 Edgewood Boulevard
Check out this stunner! This home has Fresh Interior Paint, Partial flooring replacement in some areas. A fireplace and a soft neutral color palette create a solid blank canvas for the living area. The primary bathroom features plenty of under sink storage waiting for your home organization needs. T
Living Area:
2292 Sqft.
|
4
Beds,
2
Baths
|
$432,000 |
1363 Edgewood Boulevard
Check out this stunner! This home has Fresh Interior Paint, Partial flooring replacement in some areas. A fireplace and a soft neutral color palette create a solid blank canvas for the living area. The primary bathroom features plenty of under sink storage waiting for your home organization needs. T
Living Area:
2292 Sqft.
|
4
Beds,
2
Baths
|
$432,000 |
1197 Columbia Rd Road
Welcome to Berkley Charm! Nestled in a delightful and cozy Berkley neighborhood, this charming 3-bedroom, 2-bath ranch offers comfort and incredible flexibility. Enjoy the convenience of walking to local favorites like Westbourne Market, Vinsetta Garage, and the Monarch Cafe and Park. You're also ju
Living Area:
1155 Sqft.
|
3
Beds,
2
Baths
|
$290,000 |
1197 Columbia Rd Road
Welcome to Berkley Charm! Nestled in a delightful and cozy Berkley neighborhood, this charming 3-bedroom, 2-bath ranch offers comfort and incredible flexibility. Enjoy the convenience of walking to local favorites like Westbourne Market, Vinsetta Garage, and the Monarch Cafe and Park. You're also ju
Living Area:
1155 Sqft.
|
3
Beds,
2
Baths
|
$290,000 |
26040 Marlowe Place
Welcome to this spacious and inviting colonial home in the sought-after Berkeley School District! This nearly 1,800 sq ft home features four comfortable bedrooms and an attached garage. Enjoy cooking in the beautifully updated kitchen with granite countertops, ample cabinet space, and modern finishe
Living Area:
2641 Sqft.
|
4
Beds,
4
Baths
|
$425,000 |
26040 Marlowe Place
Welcome to this spacious and inviting colonial home in the sought-after Berkeley School District! This nearly 1,800 sq ft home features four comfortable bedrooms and an attached garage. Enjoy cooking in the beautifully updated kitchen with granite countertops, ample cabinet space, and modern finishe
Living Area:
2641 Sqft.
|
4
Beds,
4
Baths
|
$425,000 |
1718 W 12 Mile Road
Welcome to your dream home! Palazzolo Properties and Homes brings 4 generations of building excellence to construct this beautifully crafted 3-bedroom, 2.5-bath "Larabee" Colonial (TO BE BUILT). These three DEEP LOTS (150') are perfectly situated right in the middle of the action at 12 & Woodward. T
Living Area:
1815 Sqft.
|
3
Beds,
3
Baths
|
$547,900 |
1718 W 12 Mile Road
Welcome to your dream home! Palazzolo Properties and Homes brings 4 generations of building excellence to construct this beautifully crafted 3-bedroom, 2.5-bath "Larabee" Colonial (TO BE BUILT). These three DEEP LOTS (150') are perfectly situated right in the middle of the action at 12 & Woodward. T
Living Area:
1815 Sqft.
|
3
Beds,
3
Baths
|
$547,900 |